Cogeneration project Key Details

 

 

 

1.1

No. Of boiler to be installed

One(1)

1.2

Capacity of the boiler (MCR)

100 TPH

1.3

Boiler outlet Stream Parameters

87 ata
515  ±Deg.C

1.4

Fuels used for the Boiler

season & off-season



Bagasse  from sugar mill, biogas from distillery ETP ,Cane trash

1.5

No. of turbo generators  to be installed  

One(1)

1.6

Turbo generators   types and capacity

1 x 18 MW extraction cum condensing

1.7

Gross Power generation

Crushing season (kW)

Off-season (kW)



18000

18000

1.8

Power to sugar plant

Crushing season (kW)

Off-season (kW)



4000

300

1.9

Power to Distillery

Crushing season (kW)

Off-season (kW)



300

500

1.10

Project Commissioning

21st May 2010

1.11

Pay Back Period

4.2 Years